Contract Details
Contract Details
Client
Client
Wheatley GroupProject Value
Project Value
£9.8mLocation
Location
GlasgowAshgill Road, Glasgow
G3 was appointed to provide civil, structural, geo-environmental and Principal Designer services for this 48No unit residential development in the north of Glasgow, with our engineering appointment also covering obtaining a demolition warrant for the former Wheatley offices which occupied the southern half of the site.
Access for SI was constrained by the presence of existing buildings across the south of the site, and delays to the demolition of these had a major impact on establishing costs (we could not fully establish the foundation solution or environmental constraints) as well as delaying the project programme. This was not a unique problem for G3 as we are comfortable drawing initial conclusions from limited information. Our strong working relationship with both the client and contractor meant that we were able to work in a flexible and adaptive fashion, managing expectations as the design evolved.
As part of our input into value engineering, G3, in conjunction with the main contractor, designed and implemented an innovative light gauge steel frame (LGSF) solution for the stair cores in lieu of traditional blockwork cores with precast concrete stair flights. This is an inherently more efficient construction philosophy. By replacing a slow, wet-trade-intensive and highly sequential traditional construction process with a precision-engineered offsite solution, our design delivered clear benefits to programme, client’s budget and buildability. The solution also maximised the benefits of offsite manufacture with the LGSF panels, including stair flight components being fabricated before arriving on site for assembly.
Services Undertaken:
Civil Engineering / Structural Engineering / Geo-Environmental / Principal Designer